Skip to content

Access Arrangement for Period commencing 2025

ATCO Gas Australia Pty Ltd (ATCO) operates the Mid-West and South-West Gas Distribution Systems (MWSW GDS). The MWSW GDS consists of natural gas distribution networks that service Geraldton, Bunbury, Busselton, Harvey, Pinjarra, Brunswick Junction, Capel and the Perth greater metropolitan area (including Mandurah).

The MWSW GDS is a regulated distribution network and requires an approved access arrangement. The current access arrangement for the GDS is valid until the next access arrangement is approved. 

The process for gas access arrangement reviews has changed since the ERA’s last review of ATCO’s access arrangement for the GDS in 2019. There are now two key stages involved in the ERA’s decision making process for an access arrangement: (a) Reference Service Proposal and (b) Access Arrangement Proposal. Under the National Gas Rules, ATCO must submit a reference service proposal to the ERA 12 months before the access arrangement proposal.

On 1 September 2022, ATCO submitted a reference service proposal for the MWSW GDS. The ERA published ATCO’s proposal for consultation on 15 September 2022 and received two submissions. On 14 November 2022, the ERA decided to approve the reference services set out in ATCO’s reference service proposal.

On 1 September 2023, ATCO submitted its access arrangement proposal for the sixth access arrangement period (AA6): 1 January 2025 to 31 December 2029. The ERA published an issues paper on 24 October 2023 to assist interested parties to make submissions on ATCO’s proposal. The ERA received 12 submissions, which were considered as part of the ERA’s draft decision process.

The ERA published its draft decision on 24 April 2024. ATCO has until 10 June 2024 to submit a revised access arrangement proposal. Interested parties have until 9 July 2024 to make submissions on the ERA’s draft decision and ATCO’s revised proposal. The ERA expects to publish its final decision on ATCO’s sixth access arrangement by November 2024.

Further information about the access arrangement framework and decision making process can be found in the ERA’s gas access arrangement guideline.

Draft Decision

Date  Documents File type
24-Apr-24
Draft Decision - Overview
Adobe PDF 747 kB
24-Apr-24
Draft Decision - Attachment 1: Access arrangement and services Adobe PDF 360 kB
24-Apr-24 Draft Decision - Attachment 2: Demand Adobe PDF 618 kB
24-Apr-24 Draft Decision - Attachment 3: Revenue and tariffs Adobe PDF 633 kB
24-Apr-24 Draft Decision - Attachment 4: Regulatory capital base Adobe PDF 1.5 MB
24-Apr-24 Draft Decision - Attachment 5: Operating expenditure Adobe PDF 602 kB
24-Apr-24 Draft Decision - Attachment 6: Depreciation Adobe PDF 697 kB
24-Apr-24 Draft Decision - Attachment 7: Return on capital, taxation, incentives Adobe PDF 596 kB
24-Apr-24 Draft Decision - Attachment 8: Other access arrangement provisions Adobe PDF 451 kB
24-Apr-24 Draft Decision - Attachment 9: Service terms and conditions Adobe PDF 758 kB
24-Apr-24 Draft Decision - Tariff Model (public) Microsoft Excel 3.3 MB
24-Apr-24 Draft Decision - Supplementary Information: Summary of submissions Adobe PDF 541 kB
24-Apr-24 Report - Patterson Research Group: Review of ATCO’s access arrangement submission documentation (public) Adobe PDF 451 kB
24-Apr-24 Report - Patterson Research Group: Survey of ATCO gas residential customers Adobe PDF 1 MB
24-Apr-24 Report - NIEIR: Review of ATCO’s gas demand and customer numbers (public) Adobe PDF 1.7 MB
24-Apr-24 Report - EMCa: Technical review of ATCO’s proposed access arrangement for 2025-29 (public) Adobe PDF 8.8 MB
24-Apr-24 Report - Frontier Economics: Accelerated depreciation modelling review (public) Adobe PDF 965 kB

Public Submissions received in response to Issues Paper

Date  Documents File type
05- Dec-23 AGL Energy  Adobe PDF 100 kB
05- Dec-23 Alinta Energy Adobe PDF 404 kB
05- Dec-23 Chamber of Minerals and Energy Adobe PDF 203 kB
05- Dec-23 Department of Energy, Mines, Industry Regulation and Safety – Building and Energy Adobe PDF 91 kB
05- Dec-23 Expert Consumer Panel Adobe PDF 554 kB
05- Dec-23 Housing Industry Association Adobe PDF 148 kB
05- Dec-23 Kleenheat Adobe PDF 623 kB
05- Dec-23 Origin Energy Adobe PDF 126 kB
05- Dec-23 Stewart Lee (individual) Adobe PDF 101kB
05- Dec-23 Synergy Adobe PDF 166 kB
05- Dec-23 Urban Development Institute of Australia
Adobe PDF 111 kB
05- Dec-23 WA Council of Social Service Adobe PDF 282 kB

Issues Paper

Date  Documents File type
24-Oct-23 Issues Paper Adobe PDF 1 MB

ATCO AA6 Proposed Access Arrangement additional supporting Information

ATCO AA6 Proposed Access Arrangement and Access Arrangement Information

Decision on ATCO’s Reference Service Proposal

Date Documents File type
14-Nov-22 Decision on Reference Service Proposal
Adobe PDF 427 kB

ERA Consultation on ATCO’s Reference Service Proposal

Date Documents File type
20-Oct-22 AGL submission
Adobe PDF 110 kB

20-Oct-22 Alinta Energy submission
Adobe PDF 278 kB

ATCO’s Reference Service Proposal

Date Documents File type
15-Sep-22 ATCO’s Reference Service Proposal
Adobe PDF 5 MB

Page last updated: 24 Apr 2024