Applications for Exemptions to Information Disclosure and Arbitration Framework

Under the National Gas Rules, a non-scheme pipeline service provider (owner/operator) may apply to the ERA for an exemption from aspects of the information disclosure and arbitration framework where the relevant exemption criteria is satisfied. Service providers of affected gas pipelines will need to assess their new regulatory obligations and if appropriate apply for an exemption.

Under Rule 585 of the National Gas Rules, there are three categories of exemptions for non-scheme pipelines (see table below). The exemptions do not automatically apply. Non-scheme pipeline service providers (owners or operators) must make an application to the ERA for an exemption. The ERA then must grant the exemption which may be subject to conditions, including an expiry date for the exemption. The non-scheme service providers must notify the ERA if circumstances changes such that the non- scheme pipeline no longer qualifies for the exemption.

Exemption Category Exemption Criteria
Category 1: Exemption from access requests and negotiations, and arbitration of access disputes requirements in Part 23 of the National Gas Rules The non-scheme pipeline is not a third party access pipeline
Category 2: Exemption from information disclosure requirements in Part 23 of the National Gas Rules Either of the following:
(a) The pipeline is not a third party access pipeline.
(b) The pipeline is a single user pipeline.
Category 3: Exemption from information disclosure requirements (except for pipeline information and pipeline service information) in Part 23 of the National Gas Rules At any time, the average daily injection of natural gas into the non-scheme pipeline calculated over the immediately preceding 24 months is less than 10TJ/day

Applying for an exemption

If you wish to apply for an exemption, or for an existing exemption to be varied or revoked, you must complete the application form provided in the table below.

All applications will then be assessed by the ERA in accordance with the National Gas Rules. An exemption that is subject to conditions may be varied either by the ERA or on application of the owner or operator of the non-scheme pipeline. The ERA may also revoke an exemption where in the ERA’s reasonable opinion, the relevant exemption criteria is no longer satisfied. Any person may apply to the ERA to have an exemption revoked.

Date Documents File type
01-Mar-18 Application for exemption form Microsoft Word 33kB
Showing results 1 to 100 of 4652 results.
  
    
Date Documents File type
09-Nov-18 test
Adobe PDF 145 kB

07-Nov-18 2018 Report to the Minister on ERA WEM compliance
Adobe PDF 542 kB

05-Nov-18 DRP Methods - Zip file including Excel and code
ZIP 1 MB

05-Nov-18 Updating DRP using Excel
Adobe PDF 1 MB

05-Nov-18 Updating DRP using R
Adobe PDF 1 MB

22-Oct-18 Bluewaters Power
Adobe PDF 768 kB

22-Oct-18 Draft report
Adobe PDF 3 MB

22-Oct-18 Fact sheet: A history of licensing in Western Australia
Adobe PDF 687 kB

22-Oct-18 Fact sheet: Snapshot – Business licensing in Western Australia
Adobe PDF 272 kB

22-Oct-18 Fact sheet: Summary of recommendations and information requests
Adobe PDF 169 kB

22-Oct-18 Frontier Economics – Case studies on best practice licensing frameworks
Adobe PDF 987 kB

22-Oct-18 Inquiry finds barriers to better business licensing in Western Australia
Adobe PDF 169 kB

22-Oct-18 NewGen Power Kwinana
Adobe PDF 493 kB

22-Oct-18 Perth Energy
Adobe PDF 712 kB

22-Oct-18 Synergy
Adobe PDF 217 kB

22-Oct-18 Western Power
Adobe PDF 796 kB

17-Oct-18 Public interest disclosure lodgement form
Microsoft Word 97 kB

11-Oct-18 Issues Paper
Adobe PDF 1 MB

11-Oct-18 WP AA4 - Final Decision Consultant report from Geoff Brown and Assoc - Review of Mr Stephen Davidsons submissions on AA4 Draft Decision
Adobe PDF 356 kB

11-Oct-18 WP AA4 - Final Decision Consultant report from Geoff Brown and Assoc - Transmission service standard benchmarks regulatory framework
Adobe PDF 182 kB

27-Sep-18 NSCGP - AGR pipeline Application form
Adobe PDF 847 kB

27-Sep-18 NSCGP - AGR pipeline Approval of exemption
Adobe PDF 230 kB

27-Sep-18 NSCGP - AGR pipeline Map
Adobe PDF 401 kB

20-Sep-18 Western Power Access Arrangement (Period 2017-2022) Final Decision
Adobe PDF 8 MB

Description: WPAA4 Final Decision
20-Sep-18 WP AA4 Final Decision Appendix 4 - Revenue Model Target Revenue Calculation
Adobe PDF 813 kB

20-Sep-18 WP AA4 Final Decision Appendix 5 - Return on Regulated Capital Base
Adobe PDF 2 MB

20-Sep-18 WPAA4 Consultant report - Dr Martin Lally of Capital Financial Consultants Ltd
Adobe PDF 627 kB

20-Sep-18 WPAA4 Consultant report - Pink Lake Analytics
Adobe PDF 1 MB

20-Sep-18 WPAA4 Final Decision Appendix 6 - GHD consultant report
Adobe PDF 2 MB

20-Sep-18 WPAA4 Final Decision Appendix 7 - Geoff Brown and Assoc consultant report
Adobe PDF 260 kB

18-Sep-18 01.01 Information Compliance Requirements
Adobe PDF 370 kB

Description: Access Arrangement for ATCO Gas Australia's Mid West and South-West Gas Distribution System (Period starting 1 January 2020 and finishing 31 December 2024)
18-Sep-18 01.02 Document index and Confidentiality claims
Adobe PDF 361 kB

Description: Access Arrangement for ATCO Gas Australia's Mid West and South-West Gas Distribution System (Period starting 1 January 2020 and finishing 31 December 2024)
18-Sep-18 01.03 Cost Allocation Method 2017
Adobe PDF 550 kB

Description: Access Arrangement for ATCO Gas Australia's Mid West and South-West Gas Distribution System (Period starting 1 January 2020 and finishing 31 December 2024)
18-Sep-18 01.04 AA5 Technical Fact Sheet
Adobe PDF 233 kB

Description: Access Arrangement for ATCO Gas Australia's Mid West and South-West Gas Distribution System (Period starting 1 January 2020 and finishing 31 December 2024)
18-Sep-18 01.05 AA5 Infographic
Adobe PDF 178 kB

Description: Access Arrangement for ATCO Gas Australia's Mid West and South-West Gas Distribution System (Period starting 1 January 2020 and finishing 31 December 2024)
18-Sep-18 01.06 Document Map
Adobe PDF 291 kB

Description: Access Arrangement for ATCO Gas Australia's Mid West and South-West Gas Distribution System (Period starting 1 January 2020 and finishing 31 December 2024)
18-Sep-18 04.01 Engage - Stakeholder Insights Report 2017
Adobe PDF 2 MB

Description: Access Arrangement for ATCO Gas Australia's Mid West and South-West Gas Distribution System (Period starting 1 January 2020 and finishing 31 December 2024)
18-Sep-18 04.02 Re-engage - Stakeholder Insights Report 2018
Adobe PDF 6 MB

Description: Access Arrangement for ATCO Gas Australia's Mid West and South-West Gas Distribution System (Period starting 1 January 2020 and finishing 31 December 2024)
18-Sep-18 04.03 Voice of Customer - Insights Report Summary
Adobe PDF 674 kB

Description: Access Arrangement for ATCO Gas Australia's Mid West and South-West Gas Distribution System (Period starting 1 January 2020 and finishing 31 December 2024)
18-Sep-18 04.04 Stakeholder Feedback on ATCOs 2020-24 Draft Plan
Adobe PDF 868 kB

Description: Access Arrangement for ATCO Gas Australia's Mid West and South-West Gas Distribution System (Period starting 1 January 2020 and finishing 31 December 2024)
18-Sep-18 05.01 Benchmarking Partial Productivity Performance
Adobe PDF 2 MB

Description: Access Arrangement for ATCO Gas Australia's Mid West and South-West Gas Distribution System (Period starting 1 January 2020 and finishing 31 December 2024)
18-Sep-18 06.01 Investment Governance - An Overview
Adobe PDF 2 MB

Description: Access Arrangement for ATCO Gas Australia's Mid West and South-West Gas Distribution System (Period starting 1 January 2020 and finishing 31 December 2024)
18-Sep-18 09.01 AA5 Demand Forecast Report - Core Energy Group
Adobe PDF 2 MB

Description: Access Arrangement for ATCO Gas Australia's Mid West and South-West Gas Distribution System (Period starting 1 January 2020 and finishing 31 December 2024)
18-Sep-18 11.02 Unaccounted for Gas Forecast and Pricing Strategy
Adobe PDF 690 kB

Description: Access Arrangement for ATCO Gas Australia's Mid West and South-West Gas Distribution System (Period starting 1 January 2020 and finishing 31 December 2024)
18-Sep-18 12.01 Asset Management Plan
Adobe PDF 2 MB

Description: Access Arrangement for ATCO Gas Australia's Mid West and South-West Gas Distribution System (Period starting 1 January 2020 and finishing 31 December 2024)
18-Sep-18 12.02 Asset Lifecycle Strategy - Corrosion Protection Systems
Adobe PDF 794 kB

Description: Access Arrangement for ATCO Gas Australia's Mid West and South-West Gas Distribution System (Period starting 1 January 2020 and finishing 31 December 2024)
18-Sep-18 12.03 Asset Lifecycle Strategy Pressure Regulating Facilities
Adobe PDF 1 MB

Description: Access Arrangement for ATCO Gas Australia's Mid West and South-West Gas Distribution System (Period starting 1 January 2020 and finishing 31 December 2024)
18-Sep-18 12.04 Asset Lifecycle Strategy Pipelines Mains and Services
Adobe PDF 2 MB

Description: Access Arrangement for ATCO Gas Australia's Mid West and South-West Gas Distribution System (Period starting 1 January 2020 and finishing 31 December 2024)
18-Sep-18 12.05 Asset Lifecycle Strategy Metering Facilities
Adobe PDF 2 MB

Description: Access Arrangement for ATCO Gas Australia's Mid West and South-West Gas Distribution System (Period starting 1 January 2020 and finishing 31 December 2024)
18-Sep-18 12.06 Asset Lifecycle Strategy - Supervisory Control and Data Acquisition
Adobe PDF 1 MB

Description: Access Arrangement for ATCO Gas Australia's Mid West and South-West Gas Distribution System (Period starting 1 January 2020 and finishing 31 December 2024)
18-Sep-18 12.07 Asset Lifecycle Strategy - Fleet
Adobe PDF 1 MB

Description: Access Arrangement for ATCO Gas Australia's Mid West and South-West Gas Distribution System (Period starting 1 January 2020 and finishing 31 December 2024)
18-Sep-18 12.08 Asset Lifecycle Strategy Property Plant and Equipment
Adobe PDF 1 MB

Description: Access Arrangement for ATCO Gas Australia's Mid West and South-West Gas Distribution System (Period starting 1 January 2020 and finishing 31 December 2024)
18-Sep-18 12.09 Wage Price Index Forecast
Adobe PDF 505 kB

Description: Access Arrangement for ATCO Gas Australia's Mid West and South-West Gas Distribution System (Period starting 1 January 2020 and finishing 31 December 2024)
18-Sep-18 12.10 PVC Mains Replacement Strategic Analysis and MRP Tool Overview
Adobe PDF 334 kB

Description: Access Arrangement for ATCO Gas Australia's Mid West and South-West Gas Distribution System (Period starting 1 January 2020 and finishing 31 December 2024)
18-Sep-18 12.11 Safety Case
Adobe PDF 2 MB

Description: Access Arrangement for ATCO Gas Australia's Mid West and South-West Gas Distribution System (Period starting 1 January 2020 and finishing 31 December 2024)
18-Sep-18 12.12 ATCO Strategic Delivery and Resource Plan
Adobe PDF 1 MB

Description: Access Arrangement for ATCO Gas Australia's Mid West and South-West Gas Distribution System (Period starting 1 January 2020 and finishing 31 December 2024)
18-Sep-18 15.01 The Utilisation estimate of gamma
Adobe PDF 1 MB

Description: Access Arrangement for ATCO Gas Australia's Mid West and South-West Gas Distribution System (Period starting 1 January 2020 and finishing 31 December 2024)
18-Sep-18 17.01 Network Innovation Scheme for ATCO
Adobe PDF 752 kB

Description: Access Arrangement for ATCO Gas Australia's Mid West and South-West Gas Distribution System (Period starting 1 January 2020 and finishing 31 December 2024)
18-Sep-18 17.02 Network Innovation Scheme explanatory memo
Adobe PDF 530 kB

Description: Access Arrangement for ATCO Gas Australia's Mid West and South-West Gas Distribution System (Period starting 1 January 2020 and finishing 31 December 2024)
18-Sep-18 18.01 Revenue & Pricing Model
Microsoft Excel 3 MB

Description: Access Arrangement for ATCO Gas Australia's Mid West and South-West Gas Distribution System (Period starting 1 January 2020 and finishing 31 December 2024)
18-Sep-18 19.01 AA5 Reference Tariffs - Tariff Setting Method
Adobe PDF 1 MB

Description: Access Arrangement for ATCO Gas Australia's Mid West and South-West Gas Distribution System (Period starting 1 January 2020 and finishing 31 December 2024)
18-Sep-18 23.01 Development Rebate Scheme Explanatory Memorandum
Adobe PDF 356 kB

Description: Access Arrangement for ATCO Gas Australia's Mid West and South-West Gas Distribution System (Period starting 1 January 2020 and finishing 31 December 2024)
18-Sep-18 Access Arrangement Information
Adobe PDF 6 MB

Description: Access Arrangement for ATCO Gas Australia's Mid West and South-West Gas Distribution System (Period starting 1 January 2020 and finishing 31 December 2024)
18-Sep-18 Access Arrangement Revision Proposal - 31 August 2018 Clean
Adobe PDF 1 MB

Description: Access Arrangement for ATCO Gas Australia's Mid West and South-West Gas Distribution System (Period starting 1 January 2020 and finishing 31 December 2024)
18-Sep-18 Access Arrangement Revision Proposal - 31 August 2018 Track changes
Adobe PDF 1 MB

Description: Access Arrangement for ATCO Gas Australia's Mid West and South-West Gas Distribution System (Period starting 1 January 2020 and finishing 31 December 2024)
18-Sep-18 Annexure F -Template Service Agreement - 31 August 2018 Clean
Adobe PDF 2 MB

Description: Access Arrangement for ATCO Gas Australia's Mid West and South-West Gas Distribution System (Period starting 1 January 2020 and finishing 31 December 2024)
18-Sep-18 Annexure F -Template Service Agreement - 31 August 2018 Tracked changes
Adobe PDF 2 MB

Description: Access Arrangement for ATCO Gas Australia's Mid West and South-West Gas Distribution System (Period starting 1 January 2020 and finishing 31 December 2024)
17-Sep-18 Response to further Independent Panel questions for ERA 11 September 2018
Adobe PDF 830 kB

17-Sep-18 Response to further Independent Panel questions for ERA 4 September 2018
Adobe PDF 343 kB

07-Sep-18 National Electrical and Communications Association (NECA WA)
Adobe PDF 861 kB

06-Sep-18 Non-scheme Pipeline Arbitration Guide
Adobe PDF 1 MB

05-Sep-18 Issues paper – Australian Energy Market Operator – Allowable Revenue and Forecast Capital Expenditure for 2016/17 to 2018/19 – Forecast Capital Expenditure Adjustment
Adobe PDF 408 kB

Description: Issues paper – Australian Energy Market Operator – Allowable Revenue and Forecast Capital Expenditure for 2016/17 to 2018/19 – Forecast Capital Expenditure Adjustment
03-Sep-18 ERA Stakeholder Forum on Draft Gas Guidelines - 3 September 2018
Adobe PDF 810 kB

31-Aug-18 ERA Secretariat response to Independent Panel questions following teleconference of 20 August 2018
Adobe PDF 610 kB

31-Aug-18 Reference Tariff Variation - 1 October 2018
Adobe PDF 313 kB

30-Aug-18 2016-2019 AEMO Forecast Capital Expenditure Adjustment Proposal
Adobe PDF 2 MB

30-Aug-18 2016-2019 AEMO Forecast Capital Expenditure Adjustment Proposal - letter
Adobe PDF 2 MB

27-Aug-18 Gas Marketing Code Consultative Committee - Expression of Interest for Membership
Microsoft Word 218 kB

27-Aug-18 Progress update status report as of Monday 27 August 2018
Adobe PDF 146 kB

27-Aug-18 Secretariat presentation to stakeholder working group – meeting of 28 June 2018
Adobe PDF 689 kB

23-Aug-18 ERA and Independent gas RoR Panel - 17 August 2018 Meeting Agenda
Adobe PDF 208 kB

23-Aug-18 ERA and Independent gas RoR Panel - 17 August 2018 Meeting Minutes
Adobe PDF 244 kB

08-Aug-18 7.12 Status Report - 1 April 2018 to 30 June 2018
Adobe PDF 652 kB

01-Aug-18 Challenges for Economic Regulators presented by Nicky Cusworth at WA Economics Forum 2018, 31 July
Adobe PDF 832 kB

Description: Challenges for Economic Regulators presented by Nicky Cusworth at WA Economics Forum 2018, 31 July
31-Jul-18 Market and GSI Rules - Compliance Report for the period 1 January 2018 to 30 June 2018
Adobe PDF 519 kB

Description: Market and GSI Rules - Compliance Report for the period 1 January 2018 to 30 June 2018
26-Jul-18 ERA investigation into Synergy's pricing behaviour - Extension of time
Adobe PDF 69 kB

Description: Notice - ERA investigation into Synergy's pricing behaviour - Extension of time
03-Jul-18 2018 Electricity Compliance Reporting Manual (clean) - commences 1 July 2018
Adobe PDF 2 MB

03-Jul-18 2018 Electricity Compliance Reporting Manual (marked-up) - commences 1 July 2018
Adobe PDF 2 MB

02-Jul-18 AEMO Ancillary Services Requirements decision 2018-19
Adobe PDF 436 kB

29-Jun-18 2018 Consumer Price Index Adjustments - Electricity Networks Access Code 2004
Adobe PDF 166 kB

Description: Notice - 2018 Consumer Price Index Adjustments - Electricity Networks Access Code 2004
29-Jun-18 Draft Explanatory Statement for the Rate of Return Guidelines - 2018 review
Adobe PDF 3 MB

29-Jun-18 Draft Rate of Return Guidelines - 2018 review
Adobe PDF 824 kB

27-Jun-18 NSCGP - Approval Letter - Ashburton Onslow Gas Pipeline
Adobe PDF 227 kB

27-Jun-18 NSCGP - Approval Letter - Beharra Springs Sales Gas Pipeline
Adobe PDF 225 kB

27-Jun-18 NSCGP - Approval Letter - Cape Preston Lateral
Adobe PDF 223 kB

27-Jun-18 NSCGP - Approval Letter - Fortescue River Gas Pipeline
Adobe PDF 226 kB

27-Jun-18 NSCGP - Approval Letter - Mid West Pipeline and Mt Magnet Lateral
Adobe PDF 228 kB

27-Jun-18 NSCGP - Approval Letter - Red Gully Export Gas Pipeline
Adobe PDF 225 kB

27-Jun-18 NSCGP - Approval Letter - Woodada Lateral
Adobe PDF 222 kB

27-Jun-18 NSCGP - Approval Letter - Xyris Pipeline
Adobe PDF 224 kB

Page last updated: 11 Nov 2018