Total and Incremental Costs

The Pilbara Infrastructure (TPI) must prepare total (maximum) and incremental (minimum) costs applicable to sections of its network for which an access proposal has been made or that the ERA considers is likely to be made. The ERA must either approve the Railway Owner's costs or make its own determination.

On 15 May 2013 Brockman Iron Pty Ltd made an application for access to use two sections of the TPI railway. On 14 August 2013 the ERA approved the commencement of negotiations between TPI and Brockman on the proposal.

2010 Total and Incremental Costs Determination

Date Documents
File type
07-Jun-11

Consultant Report Adobe PDF 332 kB
14-Apr-11
Suspension of Review of Floor and Ceiling Costs Determination
Adobe PDF47.2 kB
28-Jul-10 

Public Submission - North West Iron Ore Alliance (NWIOA) Adobe PDF 471 kB
09-Jul-10 

Floor and Ceiling Cost Proposal Adobe PDF 875 kB
09-Jul-10

Floor and Ceiling Costs Model - Public Version Microsoft Excel804 kB