In November 2015 Western Power submitted proposed amendments to its Technical Rules related to the limit for the injection of direct current into the network, the removal of out of date references to Australian Safety Standard AS 4777 (2005), and amendments to the definitions of a number of terms in the Technical Rules Glossary.
The ERA published its final decision in July 2016.
The revised Technical Rules became operational on 1 August 2016.