Rule Change: RC_2008_20

Type: Standard Rule Change Process

Submitter: IMO

Title: Demand Side Management – Operational Issues

Market Rules Affected: 2.29.5, 2.29.8A, 2.29.8B, 2.29.9A, 2.29.9B, 2.29.9C, 4.8.3, 4.10.1, 4.11.1, 4.11.4, 4.11.4A, 4.12.8, 4.14.1, 4.25.1, 4.25.2, 4.25.3B, 4.25.4, 4.25.4E, 4.25.4F, 4.25.9, 4.25A.1, 4.25A.2, 4.25A.3, 4.25A.4, 4.25A.5, 4.26.1, 4.26.1C, 4.26.2, 4.26.2C, 4.26.2D

Date Submitted: 17 July 2008

Date First Published on the IMO Website: 18 July 2008

Date Final Report Published: 24 November 2008

Current Status: The final set of Amending Rules commenced at 8.00am on 1 October 2011. The commencement table below shows the commencement date of each Amending Rule

Timeline for this change

Event Date Comments
Notification Published 18/07/2008  
First Submission period 18/07/2008 – 29/08/2008 The submission period is 6 weeks from the date the IMO published the notification
Draft Report published 26/09/2008 Must be published within 20 B-Days after the end of the submission period
Second submission period 27/09/2008 – 27/10/2008 The submission period is 20 B-Days from the date the IMO published the Draft Report
Final Report Published 24/11/2008 Must be published within 20 B-Days after the end of the second submission period
Rule Commencement   See the commencement table for the commencement of each amending rule.

Documents related to this change proposal

Submissions received in the first submission period

Synergy [54kB]

Alinta [524kB]

Submissions received in the second submission period

Synergy [52kB]

Amending Rules Commencement Dates

Rule Number Subject Commencement Date Commencement Notice
2.29.5 Include new clause 2.28.8A 1 March 2009
1
2.29.8A Interval Meters required. 1 March 2009 1
2.29.8B Verification Test required within 20 days of certification. 1 October 2010 3
2.29.9A Minimum activation notice of 4 hours. 1 March 2009 1
2.29.9B Ability to increase activation time up to 4 hours. 1 March 2009 1
2.29.9C Can’t extend minimum activation time beyond 4 hours. 1 March 2009 1
4.8.3 Loads must have same availability as DSM program 1 March 2009 1
4.10.1 DSM to be available noon to 8 pm. 1 March 2009 1
4.11.1 Certification precision to be 0.001 MW 1 March 2009 1
4.11.4 DSM cannot be Availability Class 1 1 March 2009 1
4.11.4A Capacity of DSM to be determined by its Relevant Demand 1 March 2009 1
4.12.8 Obligation drops to zero after two days of dispatch at maximum 1 March 2009 1
4.14.1 Capacity precision to be 0.001 MW 1 March 2009 1
4.25.1 DSM verification only to apply to period between October and March 1 October 2010 3
4.25.2 DSM verification testing to require load reduction for one Trading Interval 1 October 2010 3
4.25.3B Activation of DSM deemed to be a Reserve Capacity Test 1 October 2010 3
4.25.4 Reserve Capacity testing 1 October 2010 3
4.25.4E Capacity Payments to be refunded if capacity credits surrendered to IMO 1 March 2009 1
4.25.4F Capacity cannot offer supplementary reserve capacity in the year that capacity credits are surrendered 1 March 2009 1
4.25.9 System Management testing of Loads 1 October 2010 3
4.25A.1 Verification test 1 October 2010 3
4.25A.2 Verification test 1 October 2010 3
4.25A.3 Verification test 1 October 2010 3
4.25A.4 Verification test 1 October 2010 3
4.25A.5 Verification test 1 October 2010 3
4.26.1 Refunds 1 October 2009 2
4.26.1C Refunds 1 October 2009 2
4.26.2 Refunds 1 October 2009 2
4.26.2C Determination of Relevant Demand 1 March 2009 1
4.26.2D Determination of capacity shortfall 1 October 2009 2
4.26.2E Calculation of refund 1 October 2009 2
4.26.3 Calculation of refund 1 October 2009 2
4.26.3A Calculation of refund 1 October 2009 2
6.17.6 Calculation of Dispatch Payment. 1 October 2011 4
7.7.5D Remove clause determining quantity 1 October 2011 4
7.7.10 Cancellation of dispatch instructions 1 March 2009 1
7.13.1 Additional data to be provided by System Management to be used in settlement 1 March 2009 1