Skip to content

2013 Access Proposal by Brockman Iron Pty Ltd

On 15 May 2013 Brockman Iron Pty Ltd made a proposal to The Pilbara Infrastructure Pty Ltd for use of two sections of railway. On 14 August 2013 the ERA approved the commencement of negotiations between TPI and Brockman on the proposal.

Floor and Ceiling Costs Determination

TPI provided Brockman with its determination of the floor and ceiling prices that would apply. The ERA assessed TPI’s proposal and did not approve the floor and ceiling costs. On 12 September 2013 the ERA provided its own determination of the floor and ceiling costs to apply.

Following a judicial review initiated by TPI, the Authority was required to re-make the determination. The re-made determination was provided to the parties in December 2014. 

Section 10 Decision

The ERA consulted with the public on TPI's request for approval to commence negotiations with Brockman Iron. The ERA issued its  decision on 14 August 2013 to approve the commencement of negotiations. 

Brockman Iron Access Proposal

The ERA consulted with the public on TPI's proposed floor and ceiling costs following the request for access by Brockman Iron.

Brockman Iron Access Proposal

Page last updated: 28 Oct 2018