Skip to content

Pilbara Networks - Rate of Return

The Pilbara Networks Access Code requires the ERA to determine the initial WACC for the Alinta Energy Port Hedland network and the Horizon Power coastal network.

The ERA has published an issues paper that sets out a preliminary approach to determining the rate of return and seeks submissions on how the risks of the Pilbara networks may affect their rate of return.

Papers

Date Documents File type
07-Sep-21 Issues Paper
Adobe PDF 737 kB

Page last updated: 07 Sep 2021