APA Transmission (Chichester) (EIRL10)

APA Transmission (Chichester) holds an electricity integrated regional licence and is authorised to build, own and operate an electricity transmission line connecting the Roy Hill mine to Fortescue Metals Group’s iron ore mines at Christmas Creek and Cloudbreak in the Pilbara region and a distribution system interconnection between the proposed and existing substations at Christmas Creek.

Alinta Energy Transmission (Chichester) was originally granted the licence and it was transferred to APA Transmission (Chichester) on 14 June 2024.

Licensee information
APA Transmission (Chichester) Pty Ltd
ABN 97 623 412 635
Licence informationRelevant dates
Licence granted11 October 2018
Licence expires10 October 2048
Current audit period1 October 2025 to 30 September 2029