Skip to main content

Total and Incremental Costs

The Public Transport Authority must prepare total (maximum) and incremental (minimum) costs applicable to those sections of its network for which an access proposal has been made or that the ERA considers is likely to be made. The ERA must either approve the Railway Owner's costs or make its own determination.

File Attachment

Expand All | Collapse All

Document

25 Sep 2009

Document
Document
Document