Information for AES providers

Here you will find answers to some of the most frequently asked questions about the Alternative Electricity Services (AES) Framework, and the registration requirements and customer obligations for on-site power supply (OPS) service providers. 

Further information will be published for single property network (SPN) service providers once the State Government has finalised the customer obligations for these providers. 

Overview

The AES framework extends protections to customers receiving electricity under an on-selling arrangement or through new and emerging electricity business models. 

The framework can be used to regulate different types of electricity services where there is a demonstrated need for additional customer protections. When a service is regulated by the State Government, providers will need to register with the ERA, join the Energy and Water Ombudsman WA Scheme, and comply with the service-specific obligations set out in the AES Code of Practice. 

AES customers will receive protections similar to customers of licensed electricity retailers, such as Synergy and Horizon Power, and will be able to access the Energy and Water Ombudsman for help resolving disputes. They will also be able to search for their service provider and access important information on the AES Public Register. 

On-selling arrangements and new and emerging electricity services are becoming increasingly complex and supplying a growing number of customers. Currently, there are few protections in place for these customers and limited regulatory oversight or support for service providers. 

Some of the problems identified for customers of these services are: 

  • A lack of information on bills. 
  • Limited options and support for customers with complaints or disputes.
  • No protections for residential customers experiencing financial hardship or family violence. 

For this reason, the State Government decided that regulation is needed to protect both AES providers and customers. 

Two alternative electricity services are regulated under the framework. Providers of the following services must register: 

  • On-site power supply (OPS), from 1 February 2027. 
  • Single property networks (SPN), from 1 July 2027.

The State Government may choose to regulate other services in the future. 

Once regulated by the AES framework, it is against the law to provide an alternative electricity service to a customer without a registration. It is important you find out if you need an AES registration. 

An OPS service involves an agreement between an electricity customer and OPS provider that allows a customer to use electricity from a system installed at their property without owning it outright. The OPS provider owns the electricity system, and the customer pays to use all or part of the electricity produced or stored by system for an agreed price and period. This could be on a cents per-unit basis, or through a subscription fee. OPS is an additional, optional service. Customers continue to receive electricity from another provider, like Synergy or Horizon Power. 

An SPN is a distribution system that supplies electricity to at least one customer who is not in control of the distribution system, or a premise that is not occupied by an entity in control of the distribution system. These networks are supplied with electricity by another distribution system, such as Western Power’s network. SPNs are often found in apartment buildings, strata complexes, retirement villages, shopping centres and office buildings. 

Read the FAQs below about on-site power supply (OPS) services for more information on what activities are regulated by the AES framework. Additional FAQs about single property networks services (SPN), including details of excluded supply arrangements that are not required to register, will be published once the State Government has finalised the requirements and customer obligations for these providers. For up-to-date information about proposed SPN obligations, visit Alternative Electricity Services - AES framework.

Suppliers should review the activities, both prescribed and excluded, in the Electricity Industry (Alternative Electricity Services) Regulations 2026 to assess whether they need to register. If you are still unsure about whether you need to register, we encourage you to seek independent legal advice for your circumstances. For general advice, providers can contact us.

If the activities regulated by the AES framework do not apply to you and you are supplying electricity, you may need to apply to the ERA for an electricity licence or apply to Energy Policy WA for a licence exemption.  

The AES portal is an online database and hub for AES providers. Through the AES portal, providers will be able to: 

  • Submit an application to grant, renew, amend, transfer or surrender an AES registration.
  • Submit annual performance and non-compliance reports and review previous reporting data.
  • Keep track of AES documents, invoices and payments.
  • Access support from the ERA. 

Certain information submitted to the AES portal will appear on the AES public register. 

The AES portal will be available for early on-site power supply applications in January 2027.

Under the AES framework, the ERA is required to publish a record of AES applications and registrations, along with specific information on each application, registration and AES provider. We will fulfil this obligation by publishing information on the AES public register.

The AES public register will include search functions to help customers find information on their electricity provider and ensures a transparent regulatory and assessment process.

The AES public register will be published and populated as registration applications are received in early 2027.

We will publish a list of AES applications and registrations on the AES public register, along with information on each registration holder and applicant. This helps customers find information about their electricity provider and ensures transparent regulatory oversight. Not all information supplied by service providers will be made publicly available.

For each registration, we will publish:

  • Information about the registration, such as the registration number, status, service type and expiry date.
  • Information on the registration holder, such as legal and trading name, ABN and street address. 
  • Information for customers, such as the provider’s contact details for queries or complaints. For single property network registrations, this includes a list of registered properties. 

A key objective of the AES framework is to make it easier for customers to access information about their electricity services and contact their electricity provider with queries or complaints. 

We publish your contact information on the AES public register so customers can easily contact you for support and information. 

A licence is granted under the electricity licensing framework. This framework is intended to regulate large entities generating, transmitting, distributing or selling electricity in Western Australia. The licence places obligations and conditions on the licence holder to ensure a safe and reliable power supply. 

Some suppliers may be exempt from the requirement to hold a licence. Exemptions are generally granted where an activity may require a licence, but the cost of licensing would be greater than the benefits. A common example of this is self-supply, when an entity produces or supplies electricity for its own use, such as in an isolated mining town or remote cattle station. In both examples, the entity has its own power system, there are no external customers, and the supply of electricity is not a core business activity.

The AES framework requires organisations to register, rather than to be licensed. The regime is intended to be lighter-handed than the licensing scheme but offer more protections than the exemption framework. It balances low regulatory costs for AES providers with an appropriate level of protection for customers.

The AES framework is designed to be flexible so it can: 

  • Be applied to new and increasingly complex business models when required by the State Government.
  • Enable policy makers to tailor obligations to each type of AES.
  • Enable the ERA to take enforcement action appropriate to the non-compliance, instead of a one-size-fits-all approach. 

See the table below fora summary of the main differences between a licence and an AES registration.

SubjectLicenceAES registration
Application and assessmentApplications are assessed against a public interest test, technical and financial criteria, and are published on the ERA website for public consultation.

Applications undergo either standard or fast-track assessment processes.

A standard application is assessed against public interest criteria and published on the ERA website for public consultation. On-site power supply (OPS) registrations undergo standard assessment.

A fast-track application undergoes a streamlined process and does not include a public interest test or public consultation. Single property network (SPN) registrations undergo fast-tracked assessment.

Standard contractsApplications must include a standard form contract for the ERA's approval.AES providers must have a contract that meets the requirements set out in the AES Code of Practice.
Financial hardship policyLicence holders must develop a financial hardship policy that meets the requirements set out in the Code of Conduct for the Supply of Electricity to Small Use Customers 2022.AES providers must have a financial hardship policy that meets the requirements set out in the AES Code of Practice.
Family violence policyLicence holders must develop a family violence policy that meets the requirements set out in the Small Use Customer Code.AES providers must have a family violence policy that meets the requirements set out in the AES Code of Practice.
Code provisionsLicence holders must comply with the complete set of subsidiary legislation. For example, a retailer supplying small use customers must adhere to all the regulatory obligations in the Small Use Customer Code.The AES Code of Practice is tailored to each type of AES. Providers must comply with the parts of the Code that apply to their service.
Audits and reviewsLicence holders undertake regular performance audits and asset management reviews.

The ERA may request a compliance audit to seek additional compliance information about a provider or providers within a sector. For example, the ERA could initiate an audit/s where:

  • A registration holder is repeatedly non-compliant or commits a serious breach of AES requirements.
  • Providers in a sector have been identified as being prone to no-compliance and multiple audits would provide a sector overview.
Annual performance and non-compliance reportingLicence holders must report annually on a range of performance indicators and specified non-compliances.AES providers must report annually on a limited range of performance indicators and specified non-compliances.
Enforcement options

The ERA has a range of enforcement powers under the licensing framework, including the ability to:

  • service a Notice
  • impose a monetary fine
  • cause the contravention to be rectified
  • apply to the Governor to cancel a licence.

The ERA has a range of enforcement powers for the AES framework, including the ability to:

  • service a Notice
  • seek an enforceable undertaking
  • require the registration holder to give public notice of the contravention
  • impose a fine
  • cause the contravention to be rectified
  • revoke or suspend a registration.
Retail and distribution functionsOperators require separate licences to retail and distribute to customers.An SPN registration covers the supply, generation, transmission, distribution or sale of electricity within the registered single property network.
Ombudsman membershipRetail and distribution licensees supplying to small use customers must join the Energy and Water Ombudsman WA Scheme.AES registration holders supplying to small use customers must join the Energy and Water Ombudsman WA Scheme.

It is free to apply for an AES registration, but registration holders must pay an annual fee to the ERA once registered. 

The State Government has established how annual registration fees will be calculated, specified in Part 4 of the Electricity Industry (Alternative Electricity Services) Regulations 2026. 

Annual registration fees are calculated by taking the ERA’s total operating costs for administering the AES framework for a financial year, and allocating that cost equally for each active registration. 

The formula is: 

C/R, where: 

C = the amount of the core functions costs for the financial year

R = the total number of AES registrations held on 30 June in the financial year 

Providers with 2 registrations must pay 2 annual registration fees.

To ensure the fees providers pay for our operating costs are accurate, the annual registration fee is calculated and billed at the end of the financial year. Registered providers will receive their first invoice in August 2028 for the period 1 July 2027 to 30 June 2028.

The State Government has estimated that the annual registration fee will be around $300 per registration. For more information, contact us.

Providers supplying small use customers will also have costs for joining the Energy and Water Ombudsman WA Scheme. Refer to the Energy and Water Ombudsman’s website for more information.

The ERA is an independent regulatory body that is mostly funded by the industry participants it regulates. For the AES sector, the annual registration fee covers the ERA’s cost to administer, monitor and enforce the AES framework. The ERA does not retain a profit from these fees.

The State Government has covered the ERA’s initial costs to establish the processes and systems we need to administer the AES framework. This includes: 

  • The cost to build the AES portal and AES public register.
  • Staff to prepare guidelines and education materials.
  • The ERA’s operational costs from 1 February to 30 June 2027. 

These initial costs will not be passed on to registered providers and OPS providers will not be required to pay for the period 1 February to 30 June 2027. 

Once registered, all AES providers must: 

  • Comply with the AES Code of Practice. 
  • Pay annual registration fees to the ERA.
  • Report annual performance and non-compliance information to the ERA.
  • Comply with ERA compliance activities.

AES providers who supply services to small use customers must also join the Energy and Water Ombudsman WA Scheme.

The AES Code of Practice sets out the customer protection obligations that AES providers must comply with. They are similar to protections available to customers of licensed electricity retailers, like Synergy or Horizon Power; however, the obligations are tailored to each category of AES.

Obligations for on-site power supply providers are set out in the AES Code of Practice.

Obligations for single property network providers are under development, and further information is available from Energy Policy WA. Once the details are finalised, the State Government will add these obligations to the AES Code of Practice.

A small use customer uses less than 160 MWh of electricity each year. Small use customers can be residential or non-residential (commercial). For example, households or small businesses like newsagencies or cafés are likely to be small use customers.

Large use customers use more than 160 MWh of electricity per year and are generally larger businesses requiring a lot of energy to operate, like a supermarket, office building or manufacturing facility. 

The ERA assesses registrations and collects information from providers on the following customer categories:

  • Residential small use customers
  • Non-residential small use (commercial) customers 
  • Large use customers

Only AES providers that supply small use customers must join the Energy and Water Ombudsman WA Scheme.

The Energy and Water Ombudsman helps people navigate problems with electricity, gas and water services. They: 

  • Investigate complaints about electricity, gas and water providers.
  • Help customers and providers resolve problems. 
  • Look for ongoing or serious problems and report them to regulators like the ERA.
  • Work with the community to educate them on their consumer rights. 

The Energy and Water Ombudsman will provide an independent dispute resolution service for small use customers, at no cost to customers.

A simple, affordable, and practical dispute resolution process is vital for an effective customer protection framework. The Energy and Water Ombudsman ensures small use customers with little market power are heard. The Energy and Water Ombudsman can also help providers navigate difficult situations. 

More information about the Energy and Water Ombudsman, including how to become a member, is available on the Energy and Water Ombudsman’s website. 

AES providers that supply small use customers must be a member of the Energy and Water Ombudsman WA Scheme.

AES providers that supply only large use customers do not need to join the Energy and Water Ombudsman WA Scheme.

On-site power supply services

An OPS service involves an agreement between an electricity customer and OPS provider. It allows a customer to use electricity from a system installed at their property without owning it outright. The OPS service provider owns the electricity system, and the customer pays to use all or part of the electricity produced or stored by system for an agreed price and period. This could be on a cents per-unit basis, or through a subscription fee.

OPS is an additional, optional service. Customers continue to receive electricity from a licensed retailer, like Synergy or Horizon Power, or registered single property network provider.   

You may have heard other names for these arrangements, such as a Behind-The-Meter service or Solar Power Purchase Agreement. 

Providers operating under the Electricity Industry (Solar Power Purchase Agreements) Exemption Order 2016 will need to register as an AES provider. The Exemption Order is due to be repealed and from 1 February 2027 these providers will be captured under the AES regulatory framework. 

It is not an OPS service when: 

  • A customer has an electricity system installed on their property but does not have access to the electricity produced or stored by the system. 
  • The customer owns the electricity system outright.
  • The customer owns the electricity system through a loan from a bank or financial institution, and the arrangement is not related to the consumption of electricity from the system.
  • The system is not directly wired to the customers property.

The requirement for OPS providers to be registered commences on 1 February 2027.

The AES Portal will be open and accepting applications from mid-January 2027. We will announce the date closer to the time and provide email notification to AES subscribers. You can sign up to receive AES emails here.

We recommend you submit your application as soon as possible after the portal opens to ensure you meet your legislative obligations on time. There is no additional fee associated with registering early. The first annual fee will be for the period 1 July 2027 to 30 June 2028. 

Existing OPS service providers providing services to customers prior to 1 February 2027 are permitted a transitional period. This transitional period will assist existing service providers to maintain business operations while meeting legislative obligations. If you are an existing OPS service provider, you must apply for a registration by 28 Feb 2027. Existing OPS providers who apply by this date may then continue operations while their application for registration is considered. Operating after this date without an active application or registration is in breach of AES requirements.

If you are a prospective OPS service provider that is not yet servicing customers, you may apply at any time after the portal opens. However, you must not operate as an OPS provider until your application has been approved and your registration is active.

OPS providers should allow sufficient time to complete and submit their application. This includes preparing information required for public consultation and the ERA's assessment of the public interest. Once all required information is provided through the portal, assessment of your application may take up to 90 days. 

Customer protection obligations are set out in the AES Code of Practice and tailored to each category of AES. 

For OPS providers, the AES Code specifies obligations on topics like:

  • Transparency and minimum information disclosure, including appropriate marketing conduct and specific information being provided to customers before they sign a contract. 

  • Metering requirements, such as access to a suitable meter and meter reading. 

  • Minimum billing requirements and standards for over or undercharging. 

  • Protection for residential customers experiencing financial hardship or family violence.

  • Complaints handling and dispute resolution processes. 

  • Access to an independent dispute resolution body.

Yes, all OPS service providers are required to register, including providers supplying services to only non-residential (commercial) or large use customers. This ensures customer protections are extended to all eligible customers, and OPS customers can locate their provider’s information on the public register.

It also provides the ERA with an accurate overview of the AES sector and information to inform decisions on how best to administer the AES framework, educate and monitor providers, and improve protections for customers.

Depending on the type of customers you are providing services to, different AES Code obligations apply. AES providers that supply only large use customers are not required to join the Energy and Water Ombudsman WA Scheme. This means the obligations requiring providers to give certain information about the Energy and Water Ombudsman are not relevant to these providers. 

Applying for a registration

We will publish an AES Application Guide and specific information requirements closer to compulsory registration dates. In anticipation, AES providers should prepare the information listed below.

On-site power supply (OPS) registrations will be assessed under standard application procedures. 

OPS service providers should prepare the following information:

  • The legal and trading name of your organisation.
  • Your Australian Business Number (ABN). 
  • Contact information the ERA can use for official business.
  • Contact information customers can use for queries or complaints.
  • Information to complete the public interest test.
  • A summary of your application for public comment.
  • Customer data, such as actual or expected customer types and numbers.

Single property network (SPN) registrations will be assessed under fast-track application procedures. 

SPN service providers will need the following information:

  • The legal and trading name of your organisation.
  • Your ABN, if you have one.
  • Contact information the ERA can use for official business.
  • Contact information customers can use for queries or complaints.
  • SPN data, including property addresses and customer data, such as actual or expected customer types and numbers.

More information for SPN providers will be published when the State Government finalises the requirements for SPN providers. 

Standard application 

Under the standard application process, the ERA must assess all criteria outlined in Part 3A of the Electricity Industry Act 2004 and section 26(1)(a) of the Economic Regulation Authority Act 2003. This includes assessing your application against public interest criteria and publishing details of your application on the ERA website for public consultation. 

When you submit your application, you will need to provide a summary of your proposed activities and information explaining how your proposed activities are not in conflict with the public interest. This information will be published for public comment. A template will be available through the AES portal to assist you to address the public interest test.

On-site power supply (OPS) registrations are required to undergo standard application processes. 

Changes to a registration granted under a standard application process, such as renewal, major amendments to, or the transfer of, an OPS registration, will also prompt a public interest test and public consultation. 

All applications to surrender a registration will be assessed through the standard application process.

Fast-track application 

When the State Government adds a new service to the AES regulatory framework, it can stipulate that the ERA does not have to assess applications against a public interest test or carry out public consultation to grant, renew, amend or transfer a registration. This is referred to as a fast-track application.   

While the ERA has up to 90 days to assess an application, it is expected that fast-track applications will be assessed within 10 business days.

Single property network (SPN) registrations will undergo a fast-track application processes, except when a SPN registration holder is applying to surrender a registration.

When approving a standard application to grant, renew, amend, transfer or surrender an AES registration, the ERA must be satisfied that the decision is not in conflict with the public interest. This requirement, and the matters the ERA must consider, are set out in Part 3A of the Electricity Industry Act 2004 and section 26(1) of the Economic Regulation Authority Act 2003. 

Some of the matters the ERA must consider are: 

  • Environmental considerations.
  • Social welfare and equity considerations, including community service obligations.
  • Economic and regional development, including employment and investment growth.
  • The interests of customers generally or of a class of customers.
  • The interests of any registration holder, or applicant for registration, who may be affected by the exercise of the power.
  • The importance of competition in electricity industry markets.
  • The policy objectives of government in relation to the supply of electricity.

On-site power supply (OPS) applications must undergo a public interest test. 

When you apply for an OPS registration, or make changes to one, you must provide enough information for the ERA to consider the matters above. This process is called a public interest test. 

Single property networks (SPN) applications are not required to undergo a public interest test. 

The ERA does not need to apply the public interest test to fast-track applications. This includes SPN applications to grant, amend, renew or transfer a registration. However, all applications to surrender a registration must follow the standard process and include a public interest test.

Yes, you must register for each service regulated by the AES framework. 

There are different application processes, information requirements and customer obligations for each service. Registering for each AES service you provide ensures that eligible customers have access to customer protections, accurate information is recorded and published, and annual registration fees are accurate. 

Please see the When do OPS providers have to register by? and When do SPN providers have to register by? FAQs below for further information on when the portal opens and when applications must be submitted. 

Under the AES framework, the ERA is required to publish a record of all AES applications and registrations, along with specific information on each application, registration and AES provider. The ERA fulfils this obligation by publishing information on the AES public register.

This helps customers find information about their AES provider and ensures a transparent regulatory and assessment process.

The AES public register will be published and populated as applications are submitted and assessed from early 2027.

If the ERA denies your AES registration application, you must not provide AES services.

If you do not agree with a decision we have made, we may be able to help. Please contact us to discuss your concerns. You may also wish to seek independent legal advice. 

Under the AES regulatory framework, applicants who do not agree with certain decisions the ERA has made can request a review. These are called ‘reviewable decisions’ and are reviewed by the State Administrative Tribunal (SAT). SAT is an independent body that reviews a wide range of government decisions and determines disputes. 

An application for review must be made within 28 days of receiving notice of the decision.

Reviewable decisions are listed in the Table below. 

ItemReviewable decisions (Electricity industry Act 2004, section 59U)Who may apply for a review (Affected person)
1A decision of the Authority under section 59M to refuse to grant a registrationThe applicant
2A decision of the Authority under section 59M to refuse to renew a registrationThe registration holder
3A decision of the Authority under section 59M to refuse to approve the transfer of a registrationThe applicant
4A decision of the Authority to impose a term or condition on a registration under section 59O(3)The registration holder
5A decision of the Authority to amend a term or condition of a registration under section 59O(4)The registration holder
6A decision by the Authority as to the period of registration or renewal of registration under section 59PThe registration holder
7A decision of the Authority under section 59R to refuse to approve the surrender of a registrationThe applicant

A registration holder must apply to the ERA through the AES portal to the ERA to surrender a registration. In assessing the surrender of a registration, we must be satisfied that the decision is not in conflict with the public interest. This applies to all surrender applications.

You will need to demonstrate that any remaining customers will maintain their electricity supply with another registered provider, license holder, or an exempt supplier. You must provide confirmation that the transition between suppliers does not cause major disruptions for customers. This may have already happened, or you may have a plan in place to ensure it will happen.

You will also need to ensure that any distribution assets associated with your registration have been handed over to another registration holder, a licensee, or an exempt entity or disposed of in a manner consistent with Western Australian legislation. 

We may request additional information when assessing a complex or contentious application. We are unlikely to undertake public consultation on a surrender application; however, the outcome of the decision will be published on the AES public register.

If you are planning to or have permanently ceased providing the services approved under your AES registration, you must apply to the ERA through the AES portal to surrender your licence. The requirement for the ERA to approve a surrender application is to confirm: 

  • Any remaining customers will be supplied by a new registration holder, licensee or exempt supplier that can provide electricity and appropriate customer protections.
  • Any relevant assets have been suitably dealt with prior to the registration holder ceasing to provide the service.

You must continue to provide AES Code obligations until we approve your application. 

A registration holder may sometimes wish to transfer their registration to another entity. 

For example, Company A sells its business to Company B, including their AES operations. There are two options for addressing the AES registration.

  • Option 1 - Company A applies to surrender its registration and Company B applies for a new registration. 
  • Option 2 - Company B applies to have the registration transferred from Company A to Company B. 

In this example, a transfer of a registration may be a better option as it ensures uninterrupted protections for customers and, for single property network services, negates the need for a public interest test for Company A’s surrender application.

All transfer applications require assessment and approval by the ERA. The transfer application must be submitted by the recipient through the AES portal. Applicants must demonstrate that the transition between service providers will create minimal disruption for customers.

AES providers must keep their contact details up to date so you do not miss important information, and your customers and the ERA can contact you.

Contact information can be updated through the AES portal. Once you become aware of a change to your contact information, you must update your information as soon as possible. 

This includes changes to the contact information you have provided for official ERA business, and the details you have provided for customer queries and complaints.

Annual reporting

AES service providers must report certain information to the ERA each year. This is called performance and compliance reporting. This information gives an overview of a provider’s performance in delivering electricity services to customers and how well it complies with the customer protection obligations of the AES framework. This information will assist the ERA to monitor registered providers and helps the ERA and public understand sector trends.

As part of our role in administering the AES framework, we are required to provide the Minister for Energy with an annual report on how the AES framework is operating. The performance and compliance data we receive from providers will be a key source of information for this report. We may also make recommendations to the Minister where we identify opportunities to improve the framework. 

AES providers will be required to report annually on a set list of performance and compliance indicators. Each AES service will have tailored performance and compliance indicators based on the type of service provided. 

The ERA will not request information that identifies individual customers or discloses their personal information. 

More information on the performance indicators that on-site power supply providers will be required to report, along with supporting documentation and guidelines, will be published shortly.

Annual performance data will be aggregated and published as part of the ERA’s annual report on the operation of the AES framework. The published data and report are general in nature and intended to highlight sector trends, support transparency and inform stakeholders about the performance of the framework. 

The ERA will use compliance information to monitor compliance with the AES Code across the sector and by individual providers. This information may be used, along with information from other sources such as the Energy and Water Ombudsman, to identify areas where the ERA could provide additional education and support materials. 

In some cases, reported non-compliances could lead to an investigation and, ultimately, enforcement action. Where enforcement action is undertaken, we will publish information on the AES public register. 

The ERA will not publish information that identifies individual customers or discloses their personal information. 

All reported data is stored in accordance with ERA’s privacy policy, confidential information policy and other WA legislation. 

Compliance and enforcement

Compliance and enforcement activities will start on the following dates: 

  • On-site power supply service providers, 1 February 2027. 
  • Single property network providers, 1 July 2027. 

After these dates, AES providers must register with the ERA and provide customer protections as specified in the AES Code of Practice. 

Our approach to compliance and enforcement aims to both encourage compliance and address and deter non-compliance. It allows us to hold registration holders that fail to comply with their obligations under the AES framework to account. 

We will use the following methods to support registration holders achieve their compliance obligations:

  • In the period leading up to the date of compulsory registration for each category of AES, hold workshops and industry forums to help AES providers understand their obligations.
  • Identify potential breaches, investigate and identify any subsequent education or other prevention or enforcement actions that may be required.
  • Ensure an investigation into alleged non-compliance is conducted in an efficient and professional manner, including applying procedural fairness and ensuring investigation decisions are informed by the relevant facts. 
  • Ensure our compliance responses to breaches are proportionate to the circumstances of the non-compliant behaviour.
  • Where relevant, publish investigations and outcomes on our website to improve accountability, transparency and participant understanding. 

The AES registration compliance and enforcement functions ensure the necessary protections for customers of AES providers, particularly those who are vulnerable or disadvantaged, are met.

The ERA’s enforcement powers apply to both registered AES providers and those AES providers that have not registered.

These powers include:

  • Serving a notice of contravention on the service provider, which requires the contravention to be rectified within a specified period.

  • If the service provider fails to comply with the notice of contravention, one or more of the following actions may be taken by the ERA:

    • Accept a written undertaking, through which the service provider must commit to rectify the contravention within a set period.

    • Require the service provider to give a public notice of the contravention in a manner determined by the ERA.

    • Order payment of a monetary penalty (up to $100,000 plus $5,000 per day that the non-compliance continues).

    • Cause the contravention to be rectified at the expense of the service provider to the satisfaction of the ERA.

    • Revoke or suspend the registration.

The Electricity Industry Act 2004 specifies that we can order payment of a monetary penalty (up to $100,000 plus $5,000 per day that the non-compliance continues). 

A monetary penalty would not be imposed without prior notification to the applicant for registration or registration holder, and giving the party reasonable time to rectify the non-compliance. 

The ERA’s enforcement powers apply to both registered and unregistered AES providers.