Type: Standard Rule Change Process
Submitter: IMO
Title: Demand Side Management – Operational Issues
Market Rules Affected: 2.29.5, 2.29.8A, 2.29.8B, 2.29.9A, 2.29.9B, 2.29.9C, 4.8.3, 4.10.1, 4.11.1, 4.11.4, 4.11.4A, 4.12.8, 4.14.1, 4.25.1, 4.25.2, 4.25.3B, 4.25.4, 4.25.4E, 4.25.4F, 4.25.9, 4.25A.1, 4.25A.2, 4.25A.3, 4.25A.4, 4.25A.5, 4.26.1, 4.26.1C, 4.26.2, 4.26.2C, 4.26.2D
Date Submitted: 17 July 2008
Date First Published on the IMO Website: 18 July 2008
Date Final Report Published: 24 November 2008
Current Status: The final set of Amending Rules commenced at 8.00am on 1 October 2011. The commencement table below shows the commencement date of each Amending Rule
Timeline for this change
| Event |
Date |
Comments |
| Notification Published |
18/07/2008 |
|
| First Submission period |
18/07/2008 – 29/08/2008 |
The submission period is 6 weeks from the date the IMO published the notification |
| Draft Report published |
26/09/2008 |
Must be published within 20 B-Days after the end of the submission period |
| Second submission period |
27/09/2008 – 27/10/2008 |
The submission period is 20 B-Days from the date the IMO published the Draft Report |
| Final Report Published |
24/11/2008 |
Must be published within 20 B-Days after the end of the second submission period |
| Rule Commencement |
|
See the commencement table for the commencement of each amending rule. |
Documents related to this change proposal
Submissions received in the first submission period
Submissions received in the second submission period
Amending Rules Commencement Dates
| Rule Number |
Subject |
Commencement Date |
Commencement Notice |
| 2.29.5 |
Include new clause 2.28.8A
|
1 March 2009
|
1 |
| 2.29.8A |
Interval Meters required.
|
1 March 2009
|
1 |
| 2.29.8B |
Verification Test required within 20 days of certification.
|
1 October 2010 |
3 |
| 2.29.9A |
Minimum activation notice of 4 hours.
|
1 March 2009
|
1 |
| 2.29.9B |
Ability to increase activation time up to 4 hours. |
1 March 2009
|
1 |
| 2.29.9C |
Can’t extend minimum activation time beyond 4 hours. |
1 March 2009
|
1 |
| 4.8.3 |
Loads must have same availability as DSM program
|
1 March 2009 |
1 |
| 4.10.1 |
DSM to be available noon to 8 pm.
|
1 March 2009 |
1 |
| 4.11.1 |
Certification precision to be 0.001 MW
|
1 March 2009 |
1 |
| 4.11.4 |
DSM cannot be Availability Class 1 |
1 March 2009 |
1 |
| 4.11.4A |
Capacity of DSM to be determined by its Relevant Demand |
1 March 2009 |
1 |
| 4.12.8 |
Obligation drops to zero after two days of dispatch at maximum
|
1 March 2009 |
1 |
| 4.14.1 |
Capacity precision to be 0.001 MW
|
1 March 2009 |
1 |
| 4.25.1 |
DSM verification only to apply to period between October and March |
1 October 2010 |
3 |
| 4.25.2 |
DSM verification testing to require load reduction for one Trading Interval |
1 October 2010 |
3 |
| 4.25.3B |
Activation of DSM deemed to be a Reserve Capacity Test |
1 October 2010 |
3 |
| 4.25.4 |
Reserve Capacity testing |
1 October 2010 |
3 |
| 4.25.4E |
Capacity Payments to be refunded if capacity credits surrendered to IMO
|
1 March 2009 |
1 |
| 4.25.4F |
Capacity cannot offer supplementary reserve capacity in the year that capacity credits are surrendered |
1 March 2009 |
1 |
| 4.25.9 |
System Management testing of Loads
|
1 October 2010 |
3 |
| 4.25A.1 |
Verification test |
1 October 2010 |
3 |
| 4.25A.2 |
Verification test |
1 October 2010 |
3 |
| 4.25A.3 |
Verification test |
1 October 2010 |
3 |
| 4.25A.4 |
Verification test |
1 October 2010 |
3 |
| 4.25A.5 |
Verification test |
1 October 2010 |
3 |
| 4.26.1 |
Refunds |
1 October 2009 |
2 |
| 4.26.1C |
Refunds |
1 October 2009 |
2 |
| 4.26.2 |
Refunds |
1 October 2009 |
2 |
| 4.26.2C |
Determination of Relevant Demand |
1 March 2009 |
1 |
| 4.26.2D |
Determination of capacity shortfall |
1 October 2009 |
2 |
| 4.26.2E |
Calculation of refund
|
1 October 2009 |
2 |
| 4.26.3 |
Calculation of refund
|
1 October 2009 |
2 |
| 4.26.3A |
Calculation of refund
|
1 October 2009 |
2 |
| 6.17.6 |
Calculation of Dispatch Payment. |
1 October 2011
|
4 |
| 7.7.5D |
Remove clause determining quantity
|
1 October 2011
|
4 |
| 7.7.10 |
Cancellation of dispatch instructions |
1 March 2009 |
1 |
| 7.13.1 |
Additional data to be provided by System Management to be used in settlement
|
1 March 2009 |
1 |