Skip to content

2011 Review of Requirements for Railway Owners to Submit Cost Determinations

A Railway Owner must prepare proposed total (maximum) and incremental (minimum) costs applicable to those sections of their network on which an access proposal is likely to be made or is actually made.

The final decision clarifies the circumstances under which railway owners are required to determine costs.

Public submissions received in response to issues paper

Page last updated: 18 Oct 2018