Skip to content

Funding Arrangements of Horizon Power (2010)

In 2010 the ERA undertook an inquiry into the funding arrangements of Horizon Power. The ERA received 23 submissions in response to an issues paper and draft report. The submissions are available on our website.

The proposed efficient levels of operating and capital expenditure for Horizon Power was developed in conjunction with advice from Parsons Brinckerhoff Australia Pty Ltd who reviewed the efficiency of Horizon Power’s operating and capital expenditure forecasts and procurement processes over the inquiry period and provided technical advice to the ERA.

The ERA’s final report was delivered to the Treasurer on 18 March 2011 and tabled in Parliament on 14 April 2011.

Papers

Date Documents File type
18-Apr-11 Final report
Adobe PDF 2 MB

Description: Inquiry into the funding arrangements of Horizon Power
16-Dec-10 Draft report
Adobe PDF 1 MB

Description: Inquiry into the funding arrangements of Horizon Power
15-Dec-10 Consultant report - Operating and Capital Expenditure Review
Adobe PDF 9 MB

Description: Inquiry into the funding arrangements of Horizon Power
04-Jun-10 Issues paper
Adobe PDF 918 kB

Description: Inquiry into the funding arrangements of Horizon Power
04-Jun-10 Terms of Reference
Adobe PDF 676 kB

Description: Inquiry into the funding arrangements of Horizon Power