Concurrently with the second Code review the ERA examined the issue of pre-payment meters dealt with under Part 9 of the Code. The ERA commissioned a cost-benefit analysis and subsequently proposed a series of amendments to improve customer protection in relation to this type of metering arrangement. The ERA referred the proposed amendments to the ECCC and, following public consultation, the ECCC provided its final advice to the ERA in February 2010.