Horizon Power has submitted an updated Metrology Procedure and Mandatory Link Criteria (metering documents) to the ERA for approval.

The Metrology Procedure provides guidance on the provision, installation and maintenance of metering installations connected to the Horizon Power network.

The Mandatory Link Criteria specify any communication links required as part of a metering installation. A communications link enables a meter to be read from a remote location. 

Nearly all of Horizon Power’s meters are read remotely, since the installation of 47,000 advanced meters across regional and remote Western Australia. It has updated its metering documents to align it with the requirements of the Metering Code after completing the meter exchange project.

Prior to giving its approval, the ERA must undertake a review of the metering documents.

2017 Review

Date Documents
File type
14-Nov-17
Draft Findings on the Review of Horizon Power's Mandatory Link Criteria
Adobe PDF 507 kB
14-Nov-17
Draft Findings on the Review of Horizon Power’s Metrology Procedure
Adobe PDF 552 kB
04-Sep-17
Horizon Power Mandatory Link Criteria 2017
Adobe PDF 790 kB
04-Sep-17
Horizon Power Report on amendments to Mandatory Link Criteria (August 2017)
Adobe PDF 813 kB
24-Jul-17
Horizon Power Report on amendments to Metrology Procedure (June 2017)
Adobe PDF 489 kB
24-Jul-17
Horizon Power Metrology Procedures 2017
Adobe PDF 1.5 MB
24-Jul-17
Metrology Procedure Letter to the ERA April 2017 Adobe PDF 108 kB

2006 Review

Date Documents
File type
15-Sep-06
Decision approving Metrology Procedure
Adobe PDF 86.9 kB
15-Sep-06
McGill Engineering Pty Ltd Report – Metrology Procedure
 
Adobe PDF113 kB
15-Sep-06
Approved Metrology Procedure
 
Adobe PDF729 kB
08-Sep-06
Decision Mandatory Link Criteria
Adobe PDF 70.5 kB
08-Sep-06 McGill Engineering Pty Ltd Report – Mandatory Link Criteria
Adobe PDF 66.2 kB
08-Sep-06
Approved Mandatory Link Criteria
Adobe PDF159 kB
23-Jun-06
Horizon Power’s proposed Metrology Procedure
Adobe PDF 626 kB
23-Jun-06 
Horizon Power’s Metrology Procedure consultative process report 
Adobe PDF111 kB
23-Jun-06
Horizon Power’s Proposed Mandatory Link Criteria
Adobe PDF 75.6 kB